Commercial Control Cabinet in the X7 Energy Storage System

2026/11/16 11:21

The Commercial Control Cabinet from SAV is part of the X7 energy storage system, a containerized battery system for commercial and industrial power projects. The product page lists a pack capacity of 104.5 kWh and a system rated capacity of 5015.9 kWh, with a rated power of 2508 kW. It is listed under Power and Commercial and Industrial Energy Storage Systems and is shown as a 5 MWh class system.

Pack and System Data

The pack uses LFP 314Ah cells in a 1P104S arrangement. The nominal pack voltage is 332.8 V and the operating range is 291.2 to 374.4 V. The pack dimensions are 790 x 245 x 2180 mm and the weight is 680 kg, with an IP67 protection rating. The system uses the same LFP 314Ah cell in a 12P416S arrangement, with a nominal voltage of 1331.2 V, an operating range of 1164.8 to 1497.6 V and a rated power of 2508 kW.

The system dimensions are 6058 x 2896 x 2438 mm and the system weight is 45 tonnes or less. The operating temperature is 0 to 55 degrees Celsius for charging and -30 to 55 degrees Celsius for discharging. The humidity limit is 95 percent non-condensing and the altitude limit is 2000 m. The system protection rating is IP55, which is lower than the pack rating because the container includes ventilation and access doors.

Cooling, Power and Communication

The system uses dual-engine wind-fluid intelligent cooling. The auxiliary power is 400 Vac at 50 Hz. The communication methods are CAN, RS485 and Modbus TCP. Those interfaces let the system connect to a plant controller or a monitoring platform. The page lists cloud-based AI operations and maintenance, health prediction and remote diagnostics as functions of the system.

The control cabinet is the part that ties the battery, the cooling and the grid interface together. The buyer should confirm the protection settings, the metering point and the communication map with the site controller. The page does not list the breaker rating or the transformer interface, so those points should be checked against the project single-line diagram.

Safety and Fire Protection

The page lists multi-layered electrical safety, structural integrity and fire protection design. The fire-fighting measures include temperature detection, smoke detection, combustible gas detection, explosion-proof ventilation, a perfluorohexane fire suppression system and a water spray system. Those layers should be reviewed with the local fire authority and the insurer before the container is installed.

The certification list includes UN 38.3, CE-LVD-62477, CE-LVD-62619, CE-EMC-61000, IEC 60730, IEC 63056, IEC 62933-5-2, UL 9540A and NFPA 69. A buyer should ask for the certificate that matches the exact model and the destination market. A certificate for a different container size or a different cell does not automatically cover the ordered system.

Installation and Project Planning

The X7 is a large container, so the site needs a foundation, a crane plan and a clear route for delivery. The layout should keep the access doors and the ventilation clear, and the fire suppression system needs the clearances stated in the project drawing. The buyer should confirm the seismic and wind load for the site, because the container is tall and light relative to its volume.

The container should be positioned so a service crew can open the doors and remove a pack without moving the whole system. A spare parts list and a commissioning plan should be agreed before shipment.

Ordering and Contact

To order a Commercial Control Cabinet as part of the X7 system, send the required capacity, the rated power, the grid voltage, the communication protocol, the site altitude and temperature, the fire standard and the destination. If the project needs a container drawing for approval, request it at the inquiry stage. SAV can be reached by email at sav@sav-digital.com or by telephone at +86 0576-88177988.

The address is Building 1, No. 88 Huigu North Road, Taizhou Optoelectronic Intelligent Factory, Jiaojiang District, Taizhou City, Zhejiang Province. Send the load profile and the site plan with the inquiry, and we will confirm the configuration, the protection scheme and the delivery schedule before a quotation is issued.