Frequently Asked Questions


What is the cooperation period for commercial and industrial energy storage projects?

The recommended term of cooperation is generally 15 years.

How long does it take from contract signing to project implementation?

From signing the contract to the official commissioning of the project, it typically takes 3 to 6 months, depending on the specific conditions and complexity of the site.

What electricity consumption standards must enterprises meet to install energy storage power stations?

Currently, neither the national government nor local governments have imposed any conditions on the construction of commercial and industrial energy storage systems. In Guangdong Province, the typical minimum requirement is 5 million kilowatt-hours per year, while in Zhejiang Province, the typical minimum requirement is 3 million kilowatt-hours per year. Generally speaking, the higher the electricity consumption, the greater the energy storage capacity that can be allocated to a project.

What is the land area of the energy storage power station?

A 200 kWh energy storage power station occupies an area of approximately 1.2 square meters; if considering front-to-back safety distances, the area increases to about 3.5 square meters.

What are the site requirements for installing a energy storage power station?

As much as possible, choose a location that is far from office spaces and densely populated areas, close to the distribution room of the access point (recommended within 100 meters), and convenient for cable routing. Also, consider a hardened site that is easy to transport to, easy to lift and install, and capable of supporting weight.
Note: In actual projects, safety protection channels and isolation channels must be reserved according to the requirements of the local fire department.

Does the installation of a energy storage power station require the owner’s assistance in handling the necessary procedures?

To install a energy storage power station, you need to file the project with the local Development and Reform Bureau’s website, obtain approval for power connection from the power company, and register for energy storage subsidies. Additionally, depending on local requirements, other review procedures such as fire safety design reviews, environmental impact assessment reports, and feasibility study reports may also be necessary. Therefore, it is crucial to understand the local acceptance and approval requirements for commercial and industrial energy storage systems and to prepare the project’s preliminary budget accordingly. All of the above-mentioned procedures are handled by the integration operator; the owner only needs to cooperate by providing the required documentation.