Installed Capacity
5.6MW/11.2MWh
Location
Taizhou-Zhejiang

项目介绍

This project involves the construction of a smart energy storage power station system for commercial and industrial users. The station employs Sav’s AC/DC-integrated outdoor energy storage cabinets and outdoor grid-connected cabinets, forming a user-side energy storage solution. By leveraging peak-valley arbitrage strategies, the station performs two charge-discharge cycles daily to supply power for factory loads, ensuring reliable and stable operation.

项目效益

Through peak-valley arbitrage, the electricity consumption cost is reduced, the stable power supply in the factory area is ensured, the losses caused by production interruptions due to power outages are minimized, the continuity of production is enhanced, and the economic benefits of the enterprise are indirectly improved.

联系我们